CONEQ Logo
Back
Specialty

Consulting & Project Development

We turn territorial opportunities into viable projects. We support companies and investors in identifying, structuring, and developing projects in mining, energy, agribusiness, tourism, and infrastructure.

Our technical team carries out feasibility assessments, impact studies, permitting management, and coordination with public and private agencies. We act as the link between the territory's potential and the deal's execution, bringing technical judgment, executive experience, and a strategic network across San Juan and the wider Cuyo region.

The consulting unit supports investment project development in San Juan from the earliest stage: asset analysis, pre-feasibility, technical structuring, investor documentation, data rooms, permitting, and coordination with specialized teams in mining, energy, agribusiness, tourism, and infrastructure.

Frequently asked questions

Does CONEQ structure investment projects in San Juan?

Yes. CONEQ supports asset analysis, pre-feasibility, investor documentation, data rooms, permitting, and technical coordination.

What sectors does the development unit work in?

The unit works across mining, energy, agribusiness, tourism, infrastructure, and territorial assets with investment potential.

Can you prepare information for investors?

Yes. CONEQ can organize technical documentation, investment theses, project metrics, and materials for opportunity evaluation.

Investment and development projects

Structured territorial opportunities, ready to invest in.

Humango Project
Mining & Limestone · Available for Sale

Humango Project

A strategic reserve of high-purity limestone in the Jáchal district, San Juan, spanning 1,055.8 hectares adjacent to an...

4,532 M Tons
Limestone Resources
Up to 97.8%
CaCO3 Purity
View Project
Campo Puerto Milagro
Mining · Quartz · Feldspar · Mica

Campo Puerto Milagro

A territorial-scale mining asset in the Sierra de Valle Fértil, San Juan, spanning 9,694 hectares within the Oy geologi...

9,694 ha
Surface Area
1,048 – 2,260 masl
Elevation
View Project
Ecoplastix — Plastic Waste Recycling Plant
Industry · Plastics Recycling · Operating Asset

Ecoplastix — Plastic Waste Recycling Plant

Ecoplastix is an industrial plastic waste recycling and processing plant in San Juan, linked to the Industrias Ecobat e...

300 – 500 t/month
Processing Capacity
2,400 m² · 2 buildings
Covered Area
View Project
El Fierro
Mining · Polymetallic Exploration (Ag-Pb-Zn-Cu-Au)

El Fierro

A polymetallic exploration project (silver, lead, zinc, copper, and gold) located in San Juan. The previous operator in...

USD 10.8M (CAD)
Exploration Investment
15,284+ m
Historical Drilling
View Project
Inca Huasi Building — Residential & Commercial
Residential & Commercial · San Juan Capital

Inca Huasi Building — Residential & Commercial

**Inca Huasi** — Quechua for "house of the Inca" — is a new residential and commercial building on a premium corner of ...

9 (8 residential)
Total Floors
93+
Units
View Project
Kallithea Building — Residential & Commercial
Residential & Commercial · San Juan Capital

Kallithea Building — Residential & Commercial

In classical Greek, *Kallithea* means "the good view." Today it's San Juan's best real estate investment: a new residen...

8
Residential Floors
7 (A–G)
Layouts per Floor
View Project
Central La Palca
Hydroelectric Energy · 2026

Central La Palca

An executive project for a high-head run-of-river hydroelectric plant in Iglesia, San Juan. With an estimated investmen...

40.5 MW
Installed Capacity
196 GWh
Annual Generation
View Project
Campo Maipirinqui
Agro · Energy · Tourism · Iglesia, San Juan

Campo Maipirinqui

A productive refuge for patient capital. Campo Maipirinqui is a real asset of 405 hectares in the Andean foothills of t...

405 ha
Surveyed Area
1.05 MW
Planned Solar Plant
View Project
Pie de Palo Solar Park
Solar Energy · 2025

Pie de Palo Solar Park

Basic and detailed engineering plus site management for the 96 MW Pie de Palo Photovoltaic Solar Park in Caucete, San J...

96 MW
Projected Capacity
6 Years
Payback Period
View Project