Hydroelectric Energy · 2026

Central La Palca

An executive project for a high-head run-of-river hydroelectric plant in Iglesia, San Juan. With an estimated investment of USD 250M, this strategic project harnesses a 500-meter net head and a 25-35 km rock-bored headrace tunnel. It will supply 24-hour baseload clean energy to world-class mining operators such as Josemaría, Veladero, and Los Azules.

Central La Palca addresses a strategic need for energy for mining in San Juan: baseload renewable generation, proximity to major extractive projects, and the capacity to integrate with the Andean region's industrial demand. CONEQ supports the project's technical and commercial structuring.

Frequently asked questions

Is Central La Palca intended to supply energy for mining?

Yes. The project is designed as baseload hydroelectric generation for mining and large industrial consumers in San Juan.

Where is the project located?

Central La Palca is located in Iglesia, San Juan, a strategic area due to its proximity to major mining projects.

Executive Summary

Installed Capacity
40.5 MW
Annual Generation
196 GWh
CAPEX Investment
USD 250M